GRID · AI DATA CENTRE

Microsoft Goodyear

Microsoft Goodyear is the 14th-largest disclosed AI data-centre campus in the world by current power, drawing around 202 MW. It is operated by Microsoft for OpenAI, Microsoft, and it sits in United States.

CURRENT POWER202 MW
WORLD RANK#14 of 40
COMPUTE (EST.)205K H100e
EST. COST$7.7B

What we know

At around 202 MW, Microsoft Goodyear is among the most power-hungry computing sites ever built, with an estimated 205,145 H100-equivalent accelerators of compute and a build cost estimated near $7.7 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to a precise, published location (33.41, -112.36). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.

Explore further

Other Microsoft campuses

Other large AI campuses