STACK Infrastructure NVA02 is the 30th-largest disclosed AI data-centre campus in the world by current power, drawing around 85 MW from an operator Epoch AI has not disclosed, and it sits in United States.
What we know
At around 85 MW, STACK Infrastructure NVA02 is among the most power-hungry computing sites ever built, with an estimated 61,142 H100-equivalent accelerators of compute and a build cost estimated near $3.2 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to a precise, published location (38.75, -77.54). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.