Anthropic-Amazon New Carlisle is the 1st-largest disclosed AI data-centre campus in the world by current power, drawing around 910 MW. It is operated by Amazon for Anthropic, and it sits in United States.

CURRENT POWER910 MW
WORLD RANK#1 of 40
COMPUTE (EST.)687K H100e
EST. COST$34.5B

What we know

At around 910 MW, Anthropic-Amazon New Carlisle is among the most power-hungry computing sites ever built, with an estimated 687,216 H100-equivalent accelerators of compute and a build cost estimated near $34.5 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to locality-level precision (41.71, -86.51). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.