GRID · AI DATA CENTRE

Amazon Ridgeland

Amazon Ridgeland is the 13th-largest disclosed AI data-centre campus in the world by current power, drawing around 228 MW. It is operated by Amazon for Anthropic, and it sits in United States.

CURRENT POWER228 MW
WORLD RANK#13 of 40
COMPUTE (EST.)171K H100e
EST. COST$8.6B

What we know

At around 228 MW, Amazon Ridgeland is among the most power-hungry computing sites ever built, with an estimated 171,479 H100-equivalent accelerators of compute and a build cost estimated near $8.6 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to a precise, published location (32.40, -90.20). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.