Google Lancaster is the 27th-largest disclosed AI data-centre campus in the world by current power, drawing around 137 MW. It is operated by Google for Google DeepMind, and it sits in United States.

CURRENT POWER137 MW
WORLD RANK#27 of 40
COMPUTE (EST.)87K H100e
EST. COST$5.2B

What we know

At around 137 MW, Google Lancaster is among the most power-hungry computing sites ever built, with an estimated 86,913 H100-equivalent accelerators of compute and a build cost estimated near $5.2 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to a precise, published location (39.73, -82.68). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.