Meta Temple

Meta Temple is the 24th-largest disclosed AI data-centre campus in the world by current power, drawing around 152 MW. It is operated by Meta, and it sits in United States.

CURRENT POWER152 MW
WORLD RANK#24 of 40
COMPUTE (EST.)173K H100e
EST. COST$5.8B

What we know

At around 152 MW, Meta Temple is among the most power-hungry computing sites ever built, with an estimated 173,248 H100-equivalent accelerators of compute and a build cost estimated near $5.8 billion. These are estimates from Epoch AI’s Frontier Data Centers tracker (CC BY) — a curated set of the largest disclosed AI campuses, not a census, and currently US-heavy. This campus is located to a precise, published location (31.13, -97.36). Power, compute and cost figures are Epoch estimates that change as sites are built and disclosed. Snapshot taken 2026-06-24.